I'm in a huge f***ing debt to The BADR bank for around 5 million dollars!
My only ticket out is this factory & the big forest with it i own
I need to sell ASAP to pay back the debt before they start seizing my s***!
Any one of u who finds me a buyer i swear to god I'll give u a decent commission
Not a troll ! I swear to god! Please take it seriously
If u interested in details Let's DM
Quick détails :
An existing factory previously active in the cork sector.
Strategic location: Only 30 minutes from the international port of Djendjen, 20 minutes from the East-West highway, and 45 minutes from Jijel airport.
Ideal logistics hub for exports to North Africa and the Middle East.
Total area: 13,200 m² (production halls, storage areas, administrative offices).
Built surface: 6,000 m² covered.
Production hall height: 14 m clear ceiling height.
Electrical supply: 1,200 kVA industrial line.
Infrastructure: High-flow water, connected natural gas, complete compressed air system installed.
Connectivity: Fiber optic internet available.
Systems: Full sanitation and security in place.
Ready for rapid reactivation and industrial development, operational in as little as 48 hours with minimal bureaucracy.
A Private Cork Forest (700 to 1,000 Hectares):
Owned by private proprietors, located in immediate proximity to the factory.
One of the best cork zones in Algeria in terms of quality and yield.
In preparation for a long-term lease contract, ranging from 50 to 100 years.
Included as an integral part of the project to ensure raw material security.
Our vision is to establish a complete vertical integration:
This model offers:
Long-term securing of raw material supply.
Cost reduction.
Production stability.
Strong strategic value for your group in North Africa, with access to the Algerian and African markets via the African Continental Free Trade Area (AfCFTA), reaching over 1.3 billion consumers.
Low operational costs with qualified local workforce.
Attractive investment climate and solid trade relations.
We are seeking investment to preserve this prestigious factory and repair the forest, addressing urgent needs.
Flexibility is key – we are open to:
Full sale of the factory and forest lease.
Partnership models, such as co-venture (50/50) with shared investment and benefits, or operational partnership combining your advanced cork technology with our Algerian infrastructure.
Investment funding for revival and expansion.
Any alternative structure you deem appropriate, including phased implementation or specific conditions.
Growing your own cork is like printing your own money
U guys can Contact big Cork Companies Like Amorim or whatever u see fit directly & offer them this
U guys can Contact big Cork Companies Like Amorim or whatever u see fit directly & offer them this
I’ll buy it; outright, 1 million usd final offer
I’ll buy it; outright, 1 million usd final offer
Bro u didn't see the f***ing part where i said I'm owed 5 million by the bank??
And this price is ridiculous in every metric
Bro u didn't see the f***ing part where i said I'm owed 5 million by the bank??
And this price is ridiculous in every metric
You said 5 million in debt you never stated a price for the properties?
Didn’t say what currency either
You said 5 million in debt you never stated a price for the properties?
7 Millions for everything!
DM.
Back off.
7 Millions for everything!
Let me talk to my team
7 Millions for everything!
What can we use for the escrow
Quick détails :
An existing factory previously active in the cork sector.
Strategic location: Only 30 minutes from the international port of Djendjen, 20 minutes from the East-West highway, and 45 minutes from Jijel airport.
Ideal logistics hub for exports to North Africa and the Middle East.
Total area: 13,200 m² (production halls, storage areas, administrative offices).
Built surface: 6,000 m² covered.
Production hall height: 14 m clear ceiling height.
Electrical supply: 1,200 kVA industrial line.
Infrastructure: High-flow water, connected natural gas, complete compressed air system installed.
Connectivity: Fiber optic internet available.
Systems: Full sanitation and security in place.
Ready for rapid reactivation and industrial development, operational in as little as 48 hours with minimal bureaucracy.
Is the factory being sold with the land title or through a lease/concession?
What is the zoning classification for the site and are there restrictions on industrial use?
Any liens or mortgages tied to the site?